What makes a long leader trip different than a regular bottom fishing trip ? Do they rig different without the dropper loops ?
Address: 653 SW Bay Blvd., Newport, OR 97365, USA
Emma fleming | Aug 20, 2019
One is longer than the other
Itzik Stahl | Aug 20, 2019
Pls, ask Mr. Alex Brown from Newport.
Thanks! Your answer is awaiting moderation.