Get your permits. Mill the old surface, lay down the grade and base. Install and compact the asphalt. Stripe and mark.
You start with securing subbase then securing base materials as needed to the type of sub base also making sure your sub base is graded correctly for water runoff to drains etc. Then you look at how many inches of asphalt you want usually 3 inches of asphalt for a big parking lot with and about a foot or two of bass