3rd floor low key but the pool in the new building is gonna be done
3rd Floor with a room key. The new pool complex is set to open in December. The current pool is open during construction.
Sorry cant help here
New pool open in the Fall. 3rd key pass for exiting. Under Construction last told. O would call to be a sure
I don't know about the pool.
Third floor I think
Not sure...sorry
Not to sure i didnt go to the pool.
Thanks! Your answer is awaiting moderation.