The average dry-out takes in between 3 to 7 days. If the structure has been exposed to water over a extended period of time it might take longer.
The typical dry-out takes between 3 to 7 days. If the structure has actually been exposed to water over a long period of time it might take longer.
Thanks! Your answer is awaiting moderation.