They are bulldozing and rebuilding a larger store. The store was too small for the volume they have been doing. Kitchen area and bathrooms are scheduled to be larger as well. Down time is minimum 3 months, but they told me it is possible it could take up to 6 months. The same manager and most of the same crew will be returning when it reopens.
I think they are remodeling
Remodeling
Thanks! Your answer is awaiting moderation.