"The Bayonne Bridge’s pedestrian walkway is closed for the duration of the Raise the Roadway construction project". https://www.panynj.gov/bridges-tunnels/bayonne-bridge-pedestrian-bicycle-info.html Sep 22, 2018, 1:56 PM Soon They've only completed half of the bridge deck. They'll add the pedestrian path when they finish the second half. webcam The big yellow things are constructing the second half of the approach spans. They're almost done.
No bikes yet, no pedestrian area yet.
No Bicycle
I'm not sure. I haven't been there for over a month. I would check the port authority website. Good luck. Enjoy the ride.
Thanks! Your answer is awaiting moderation.