Address: 12620 Crain Hwy, Newburg, MD 20664, USA
Phone: +13018434600
Sunday: Open 24 hours
Monday: Open 24 hours
Tuesday: Open 24 hours
Wednesday: Open 24 hours
Thursday: Open 24 hours
Friday: Open 24 hours
Saturday: Open 24 hours
Michael Habgood
It’s ugly
Laura Chessin
We drove up from Virginia to enjoy the bright lights. The full moon rising behind the majestic conveyor belt paled by comparison… much prettier than the Milky Way.
smallteam
The facility consists of two base loaded 624 MW coal-fired steam generating units, four 65 MW oil-fired peaking combustion units, and two 18 MW black start peaking turbines. The two coal-fired units are base-loaded supercritical steam units which went into operation in 1970 and 1971. The four peaking units are General Electric Frame 7 units which went into operation in 1973, while the two black start peaking units are General Electric Frame 5 units which went into operation in 1970 and 1971. Coal is delivered to the Morgantown generating station by CSX Transportation train using the Pope's Creek Subdivision rail line. Construction of a coal barge unloading pier on the Potomac River began in 2007.
Oscar Platt
Delicious power, my wonderful wife and I came here to check out new light fixtures for our bedroom. Recently I've struggled with impotency; we assumed that a new light fixture might be able to put me in the mood! We found the light fixture, and there have been no problems since. 10/10 would recommend!
Thanks! Your review is awaiting moderation.
it doesn't look good for jobs up there. they aren't asked to generate power that often anymore. i was up there last week on 6/17 and 6/18 working on some safety stuff. i they weren't running at all.
Gap inc. does their cleaning
Thanks! Your answer is awaiting moderation.
Thanks! Your question is awaiting moderation.