Ca Green Attic & Insulation

Category: Insulation contractor

Address: 7852 Lena Ave, West Hills, CA 91304, USA

Phone: +18189018338

Opening hours

Sunday: 8AM–7PM

Monday: 8AM–7PM

Tuesday: 8AM–7PM

Wednesday: 8AM–7PM

Thursday: 8AM–7PM

Friday: 8AM–7PM

Saturday: 9AM–4PM

Reviews

Matthias Stone

Nov 25, 2021

This is our second time using Daniel and his team, The first time was for our kitchen, and this second time was for our bathroom. Both times were outstanding! Quality work, timely, professional, and great overall customer service. We highly recommend them!

Amelie Barnes

Nov 24, 2021

If you are looking for an efficient, professional and dependable remodeled, Ca Green Attic & Construction is your answer. Everyone involved in the process from start to finish was helpful and courteous. Joseph, Daniel and the entire crew are able to plan, design and build the space you want to remodel. Any problems or uncertainty on your part or theirs is immediately addressed. You will thoroughly enjoy the finished product.

Frederick Baker

Nov 23, 2021

This is the third home project my wife and I have completed through Ca Green Attic & Construction. From start to finish, they did an excellent job. The installed new drawers and retrofitted our existing built-in cabinetry for a new UHD TV and entertainment system.The drawers are great, the wood stain matches perfectly, and they added finishing touches to allow the new entertainment system to fit perfectly. It all looks as if it were designed and custom-built that way originally!

Amy Murphy

Nov 23, 2021

I hired them to renovate my kitchen and I thought Daniel was very good at communicating and the work was clean and well done. The quote was fair given the quality of the cabinets and I appreciated their design ideas. The kitchen is very nice now, and my family loves being in this new kitchen.

Thanks! Your review is awaiting moderation.

Questions & Answers

How long does a bathroom remodeling typically take from start to finish?

Connor Anderson | Sep 10, 2021
Alexa Kim Henderson | Sep 10, 2021

At the threat of sounding evasive, we really must state that "it depends." The scope of the bathroom remodeling dictates how long the project will take. For instance, if you are transferring your components and reconfiguring the room, the building will certainly take a little bit longer. However, it is necessary to keep in mind that moving components will normally require structure department permits, which will also contribute to the project time.Here's a sample timeline, for illustration purposes only, of a bathroom remodeling project that does not include relocating fixtures:Meet with a redesigning specialist for a Design Consultation and get a proposal (1 week).Meet at our display room, finalize the scope of the project and the terms of a Remodeling Agreement (2 to 3 weeks).Select all the products for the project (1 to 4 weeks).Materials are ordered and delivered (3 to 6 weeks).Demolition and removal of old materials and appliances (1 week).

What percent of home value should be spent on kitchen remodel?

Blais Peters | Sep 10, 2021
Idaly Styles | Sep 10, 2021

The rule of thumb is that you should spend between 5 and 15 percent of their home's total value on your kitchen remodel. This is the optimum range for homeowners to spend and expect to recoup during a home's resale.

Why should I insulate my attic?

DEANNA JOEL | Sep 10, 2021
Lynn TREVOR | Sep 10, 2021

If you do not enjoy the current temperature that you have during hot summers or cold winters and you feel like your light bills are really high or the need to have your HVAC system on most of the time, then it might be a clear sign of having your attic insulated to prevent all of the previous events.

Thanks! Your answer is awaiting moderation.

Thanks! Your question is awaiting moderation.

Related Places