Address: 10159 S, US Hwy 41, Gibsonton, FL 33534, USA
Phone: +18136718044
Sunday: Closed
Monday: 8AM–5PM
Tuesday: 8AM–5PM
Wednesday: 8AM–5PM
Thursday: 8AM–5PM
Friday: 8AM–5PM
Saturday: 8AM–12PM
Scott Smith
All Steel did a great job replacing my warehouse's metal roof. Jeremy and his crew are always on call to patch small leaks on a moments notice. Excellent customer service and they stand by their warranty!
Joy Robertson
Recently All Steel Buildings constructed a metal building for me. The price was fair, the process was timely followed by an inspection to be sure all was correct and that I was satisfied. I highly recommend this company and thank staff and crew.
Ed Olson
July 2019 I talked to John about having a 18x23 garage building built for me on my property. I left a deposit to get things prepared for the permit. It took the county a couple of months to get the permit. In October 2019 the pad was poured by Ty. I was then told by John that the building was scheduled to be installed the week of Nov 18 and he said it would take 3 days. On Tuesday Nov 19 I contacted John to see when the guys would be out. He said not until Monday after Thanksgiving. I was okay with that, but not happy. No show or call on Monday or Tuesday.... so I called John on Wednesday... he said the guys are behind schedule and will be out Dec 2. Well that didn't happen... Finally on Friday Dec 13th the crew showed up. Material was dropped off on the pad. During the install, they noticed the pad was out of square and had to stop construction. John called me and explained the problem and it was going to be corrected. Also said they would be back out to put the building up next week, which is this week. So far, Ty (the concrete contractor) came out Friday 13th, looked at the problem and has done nothing. At this point I am extremely disappointed with this whole process. Not sure what to do next. Hopefully the owner will contact me with a solution. Update 12/20/19 John called yesterday and said that Ty was going to correct the out of square slab, by putting a cap on it and correcting the slab that is 6 inches out of square. As of today a week after All Steel noticed the problem. NOTHING HAS BEEN DONE!!! Update: The owner Bobby, personally got involved with all my concerns and made things happen. All in all I am very satisfied with my building.
Scott Smith
I had All Steel replace a steel roof on my 28,000 sq. ft. warehouse and I was really pleased with the job they did. A couple of minor snafus occurred but that's to be expected on a job of this size. The important thing was Bobby Ramey, the owner, had his crew fix the problems immediately and without argument. He made sure everything was buttoned up and looking great before they signed off.
Thanks! Your review is awaiting moderation.
I'm not sure if anyone has used a metal building as a home but they can design and build just about anything. Design, permitting, building.
Who do I ask for
I love this place good people. Big business that'll make you feel like family.
Thanks! Your answer is awaiting moderation.
Thanks! Your question is awaiting moderation.